What are the 17 key points of pneumatic conveying system design?

Source:http://tourongquan.cn/ Release time:2022-02-07 1Second

What are the 17 key points of pneumatic conveying system design?

In the process of designing and conceptualizing a pneumatic conveying system, it is necessary to fully combine and analyze the initial conditions of the design concept, such as material characteristics, basic parameters of conveying conditions, etc., to determine the type of pneumatic conveying system, and to determine the layout of conveying pipelines and their basic elements such as conveying volume, mixing ratio, and airflow velocity. As a highly automated and precisely controlled conveying system, the force conveying system needs to consider multiple key factors comprehensively in the design and implementation process. If one factor is not properly considered, it may lead to low operational efficiency of the entire system, or even the inability to meet process requirements. Next, we will introduce the 17 key points of pneumatic conveying system design with the guidance of environmental protection:

1. The pneumatic conveying system technician also needs to analyze the initial design conditions.

The initial condition includes the material characteristics involved in the pneumatic conveying system, basic parameters of the conveying condition, etc. In addition, flammable and explosive materials require stricter and more careful handling.

2. Determine the type of pneumatic conveying system.

Based on the basic parameters of the initial condition, such as material characteristics, determine whether the conveying type is positive pressure conveying, negative pressure conveying, or mixed conveying.

3. Determine the layout of the conveying pipeline.

At the same time as determining the layout of the conveying pipeline, it is also necessary to determine the structural types of the main components and draw a system layout diagram, avoiding obstacles on site as much as possible according to customer requirements. And it is also necessary to ensure the operation of the pneumatic conveying system.

4. Determine the conveying capacity

Calculate and determine the conveying capacity design of the pneumatic conveying system based on the annual conveying volume, annual operating days, work regularity, and various types of process configurations of the enterprise.

5. Determine the mixture ratio of raw materials and gases.

The material to air ratio refers to the influence of the specific gravity of materials and air during the material transportation process.

6. Determine the airflow velocity for material transportation.

What type of Roots blower, centrifugal blower, or other gas source is needed to affect the airflow velocity!

7. Calculate the amount of air required to be conveyed by the pneumatic conveying system.

8. Calculate the diameter of the conveying pipeline.

Affects the conveying capacity of the pneumatic conveying system

9. Determine the main component structure and relevant specifications of the pneumatic conveying system.

Including: ① the horizontal distance, vertical height, inclination angle, number of bends, pipeline structure, material, and support of the conveying pipeline; ② Types, structures, materials, and quantities of bifurcation pipes and switching valves; ③ The type, specification, material, and nozzle orientation of separators and dust collectors.

10. Calculate the pressure loss of the pneumatic conveying system.

Number of bends and vertical height

11. Select the type and capacity of the pneumatic conveying system fan based on the required conveying air volume, total pressure loss, and related design conditions.

12. Choose the type and capacity of the motor.

13. Determine the required motor equipment and ancillary equipment.

14. Determine the start stop operation sequence, interlock safety devices, and determine the type and capacity of the control panel.

15. Determine the specific location of the suction and exhaust ports, whether to add noise reduction devices, and determine the dust removal measures.

16. Develop installation, debugging and operation procedures.

17. Prepare the types and quantities of vulnerable parts and spare parts required.

Related products / Related products

  • Pneumatic conveying system

    Pneumatic conveying system

  • Pneumatic conveying system

    Pneumatic conveying system

  • Pneumatic conveying system

    Pneumatic conveying system

  • Dust suction truck

    Dust suction truck

2024  Jinan Xinlu Quansheng Machinery Equipment Co., Ltd    

主站蜘蛛池模板: 日本精品久久久久久久久免费 | 日韩免费黄色片 | 特黄特黄aaaa级毛片免费看 | 人人艹在线| 午夜第一页| 国产91长腿美女在线观看 | 亚洲免费观看视频 | 国产三级手机在线 | 另类欧美日韩 | 国产精品国产三级国产普通话一 | 亚洲美女影院 | 国产视频在线免费观看 | 亚洲精品美女一区二区三区乱码 | 亚洲国产综合在线 | 国产一极毛片 | 国产婷婷色综合成人精品 | 日本在线免费观看 | 国产在线激情 | 免费看成人毛片日本久久 | 国产欧美久久久精品 | 日韩不卡免费视频 | 午夜精品视频在线观看美女 | 欧美中文字幕在线观看 | 天天干天天干天天干天天干天天干 | 日日日视频 | www.av视频在线 | 免费在线a | 国产在线h | 日韩中文在线观看 | 日韩在线综合 | 亚洲手机视频 | 国产精品一区不卡 | 高清性色生活片欧美在线 | 日韩视频在线观看一区二区 | 亚洲国产第一区二区三区 | 国产精品一区高清在线观看 | 一级色视频 | 日本黄 色 成 年 人免费观看 | 日本精品三级 | 欧美中文字幕在线观看 | 男女视频免费网站 |